This building had effectively run out of power, they were at their maximum and experiencing failures.
There was an option to install a new sub-station but it was at an unaffordable cost.
Instead, we carried out a full lighting upgrade to LED lights that not only lowered power consumption but also vastly improved light levels.
We also re distributed the power system, balanced phases and finally added 21.6kW of solar power.
This freed up the enough power so that the business could operate without failure and they even had enough available power to install a new machine.
In addition to an annual saving of $23,373, they were also able to promote the fact that they were generating some of their own power which resulted in a good news story for their clients.